It"s almost impossible that both potential problems that are worrying me can occur, but there is a chance one of them might.
As I mentioned in my earlier post on this thread with only 10 levels being played for day 1 there is a danger that a large % of the field will make day 2, which might make day 2 longer than usual.
The 2nd worry is, after looking at the low numbers of Pre-reg for 1a v 1b, what happens if the 1a bust outs are rapid?
Is there a number of players or % of players which if reached would mean the day 1a would be forced to stop before the end of level ten?
Without people just turning up Fri night to play the numbers look very low.